Checklists & Quality Control
Path: /properties/[id]/renovation → Checklists Tab
Access Level: Property Owners & Collaborators
Overview
Checklists keep renovations organized and ensure nothing gets missed. From pre-demo punch lists to final quality inspections, checklists create accountability, maintain standards, and provide clear expectations for everyone involved in the project.
Checklist Fundamentals
What is a Checklist?
A checklist is a list of tasks, items, or standards to verify:
Types:
- Task checklists: Work to be completed
- Inspection checklists: Quality standards to verify
- Safety checklists: Hazard prevention
- Material checklists: Items to purchase/verify
- Closeout checklists: Final punch lists
Example Kitchen Checklist:
Kitchen Cabinet Installation
☑️ Verify wall studs located
☑️ Check level of floor
☑️ Mark cabinet heights on wall
☐ Install upper cabinets (in progress)
☐ Install lower cabinets
☐ Level and shim cabinets
☐ Secure cabinets to studs
☐ Install hardware
☐ Adjust doors and drawers
☐ Touch up paint/caulk
☐ Final cleanup
Why Use Checklists?
Quality Assurance:
- ✅ Nothing forgotten
- ✅ Standards maintained
- ✅ Consistent results
- ✅ Professional finish
Communication:
- ✅ Clear expectations
- ✅ Contractor alignment
- ✅ Progress visibility
- ✅ Reduced disputes
Project Management:
- ✅ Track completion
- ✅ Identify blockers
- ✅ Delegate tasks
- ✅ Measure progress
Documentation:
- ✅ Work history
- ✅ Inspection records
- ✅ Quality proof
- ✅ Resale evidence
Creating Checklists
Method 1: From Template
Use pre-built lists:
- Click "+ New Checklist"
- Select "Use Template"
- Browse categories:
- Room-specific (Kitchen, Bath, etc.)
- Trade-specific (Plumbing, Electrical, etc.)
- Phase-specific (Demo, Rough-in, Finish, etc.)
- Inspection types (Safety, Quality, Code, etc.)
- Select template
- Customize items
- Save checklist
Available Templates
Room Checklists:
Kitchen:
- Pre-Demo Inspection
- Cabinet Installation
- Countertop Installation
- Appliance Installation
- Flooring Installation
- Final Inspection
Bathroom:
- Tile Work Quality
- Plumbing Fixture Installation
- Vanity Installation
- Shower/Tub Installation
- Final Inspection
Bedroom/Living:
- Flooring Installation
- Painting Quality
- Trim & Molding
- Final Inspection
Trade Checklists:
Plumbing:
- Rough-in Inspection
- Pressure Test
- Fixture Installation
- Final Inspection
Electrical:
- Rough-in Inspection
- Device Installation
- Panel Inspection
- Final Testing
HVAC:
- Ductwork Installation
- Unit Installation
- System Testing
- Final Commissioning
Framing:
- Layout Verification
- Structural Integrity
- Opening Sizes
- Final Inspection
Phase Checklists:
Demolition:
- Safety Preparation
- Utility Shutdown
- Material Protection
- Debris Removal
- Post-Demo Inspection
Rough-In:
- Layout Verification
- Code Compliance
- Material Quality
- Installation Quality
- Inspector Approval
Finish:
- Surface Preparation
- Installation Quality
- Fit & Finish
- Cleanup
- Final Walk-through
Method 2: From SOW
Generate from scope:
- Complete SOW for room/area
- Click "Generate Checklist"
- System creates checklist from tasks
- Each SOW task becomes checklist item
- Customize as needed
- Save checklist
Example:
SOW: Kitchen Cabinet Installation (12 tasks)
↓
Checklist: Kitchen Cabinet Installation (12 items)
☐ Remove old cabinets → SOW Task 1
☐ Patch walls → SOW Task 2
☐ Mark layout → SOW Task 3
☐ Install uppers → SOW Task 4
... (etc.)
Method 3: Manual Creation
Build custom checklists:
- Click "+ New Checklist"
- Enter checklist details:
- Name (e.g., "Master Bath Tile QC")
- Description
- Category
- Assigned to
- Due date
- Add checklist items:
- Item description
- Priority level
- Pass/fail criteria
- Notes
- Organize items
- Save checklist
Checklist Interface
Checklist Card
Overview display:
┌─────────────────────────────────────────┐
│ 🛠️ Kitchen Cabinet Installation │
│ Category: Quality Control │
├─────────────────────────────────────────┤
│ Progress: 6 of 12 complete (50%) │
│ ■■■■■■□□□□□□ │
├─────────────────────────────────────────┤
│ Assigned: John Smith (Contractor) │
│ Due: January 20, 2025 │
│ Status: In Progress │
├─────────────────────────────────────────┤
│ [View Checklist] [Edit] [Duplicate] │
└─────────────────────────────────────────┘
Checklist Items
Item structure:
| ☑️ | Priority | Item | Status | Assigned | Due | Actions |
|---|---|---|---|---|---|---|
| ☑️ | High | Locate wall studs | ✅ Done | John | 1/15 | ... |
| ☑️ | High | Mark cabinet heights | ✅ Done | John | 1/15 | ... |
| ☐ | High | Install uppers | 🔵 In Progress | John | 1/18 | ... |
| ☐ | Medium | Install lowers | ⏳ Pending | John | 1/20 | ... |
| ☐ | Low | Touch-up paint | ⏳ Pending | Sarah | 1/22 | ... |
Item details:
- Checkbox (check when complete)
- Priority (High, Medium, Low)
- Item description
- Status indicator
- Assigned worker
- Due date
- Action menu (Edit, Delete, Comment)
Item Status
Lifecycle:
Pending (Gray)
- Not started
- Waiting for dependencies
- Future work
In Progress (Blue)
- Work underway
- Actively being completed
- Time tracked
Done (Green)
- Item completed
- Checked off
- Quality verified
Blocked (Red)
- Can't proceed
- Waiting on materials
- Issue preventing progress
Skipped (Orange)
- Not applicable
- Change order removed
- Alternate method used
Quality Control Checklists
Pre-Work Inspections
Before starting work:
Purpose: Verify site conditions
Example: Pre-Tile Checklist
☐ Substrate inspection
☐ Surface flat (1/8" in 10 ft)
☐ No loose material
☐ Moisture level acceptable (<12%)
☐ Material verification
☐ Correct tile SKU
☐ All from same dye lot
☐ No damaged pieces (checked 10%)
☐ Layout verification
☐ Layout lines marked
☐ Tile pattern confirmed
☐ Cut locations acceptable
☐ Tools & materials ready
☐ Thinset mixed properly
☐ Spacers on site
☐ Wet saw operational
☐ Safety equipment available
During-Work Inspections
Monitor quality during installation:
Example: Tile Installation QC
Check every 2 hours:
☐ Tile alignment
☐ Grout lines consistent
☐ Tile level with neighbors
☐ Pattern correct
☐ Thinset coverage
☐ 95% coverage minimum
☐ No voids under tiles
☐ Proper trowel notch size
☐ Spacing
☐ Grout joint width consistent
☐ Spacers used properly
☐ Edges straight
☐ Cuts
☐ Clean, straight cuts
☐ Proper fit around obstacles
☐ No cracks or chips
Post-Work Inspections
Final quality verification:
Example: Cabinet Installation Final QC
☐ Installation quality
☐ All cabinets level (verified with 4' level)
☐ All cabinets plumb (verified)
☐ Consistent reveal between doors
☐ Doors open/close smoothly
☐ Drawers glide properly
☐ No gaps >1/8" between cabinets
☐ Hardware
☐ All pulls/knobs installed
☐ Hardware aligned properly
☐ Screws tight, not stripped
☐ Hinges adjusted correctly
☐ Finish quality
☐ No scratches or dents
☐ Touch-up paint complete
☐ Caulking smooth and consistent
☐ Silicone at sink area
☐ Function
☐ Soft-close hinges work
☐ Drawer glides function
☐ Shelves level
☐ Cabinet lighting operational
☐ Cleanup
☐ Debris removed
☐ Surfaces cleaned
☐ Protective film removed
☐ Area ready for countertops
Safety Checklists
Site Safety
Daily safety check:
Start-of-Day Safety Checklist
☐ General safety
☐ First aid kit accessible
☐ Fire extinguisher charged
☐ Emergency exits clear
☐ Emergency numbers posted
☐ Personal protective equipment
☐ Safety glasses available
☐ Dust masks/respirators
☐ Gloves (multiple types)
☐ Hearing protection
☐ Steel-toe boots required
☐ Power tools
☐ Cords inspected (no damage)
☐ Guards in place
☐ Tools properly grounded
☐ GFCIs working
☐ Work area
☐ Adequate lighting
☐ Ventilation sufficient
☐ Floor clear of tripping hazards
☐ Wet floor signs (if applicable)
☐ Hazardous materials
☐ Chemicals properly labeled
☐ SDS sheets available
☐ Spill kit accessible
☐ Proper disposal containers
Demolition Safety
Before demo work:
Demolition Safety Checklist
☐ Utilities
☐ Electricity shut off to area
☐ Water shut off to area
☐ Gas lines verified off
☐ HVAC disconnected
☐ Structural
☐ Load-bearing walls identified
☐ Engineer approval (if needed)
☐ Support plan in place
☐ Adjacent areas protected
☐ Hazardous materials
☐ Asbestos test results (if pre-1980)
☐ Lead paint assessment
☐ Mold inspection complete
☐ Abatement plan (if needed)
☐ Protection
☐ Dust barriers installed
☐ Floor protection down
☐ HVAC vents sealed
☐ Window/door protection
☐ Debris removal
☐ Dumpster positioned
☐ Chute installed (if multi-story)
☐ Haul path clear
☐ Recycling plan
Milestone Checklists
Linking to Milestones
Checklist as deliverable:
- Create milestone
- Add checklist as deliverable
- Milestone progress tied to checklist
- Checklist must be 100% to approve milestone
Example:
Milestone 2: Rough-Ins Complete
Deliverable: Rough-In Inspection Checklist
├── Plumbing rough-in (15 items)
├── Electrical rough-in (12 items)
├── HVAC rough-in (8 items)
└── Insulation (6 items)
Total: 41 items
Milestone progress: 32 of 41 complete (78%)
Milestone status: In Progress
Can't approve until: 41 of 41 complete (100%)
Inspection Approval
Gate for milestone payment:
Workflow:
- Contractor completes work
- Contractor checks off items
- Contractor submits checklist
- You inspect each item
- You approve/reject each item
- If all approved → Approve milestone
- If issues → Create punch list
- Issues fixed → Re-inspect
- All approved → Milestone complete → Draw request
Punch Lists
What is a Punch List?
A list of incomplete or deficient items that need correction before final approval.
Purpose:
- Document deficiencies
- Require corrections
- Hold payment until fixed
- Maintain quality standards
Creating Punch Lists
During inspection:
- Walk through work area
- Note deficiencies
- Take photos
- Create punch list
- Assign to contractor
- Set deadline
- Track completion
Punch list format:
Kitchen Cabinet Punch List
Date: January 20, 2025
Inspector: [Your Name]
1. [High] Upper cabinet door #3 misaligned
Location: Above sink
Photo: IMG_1234.jpg
Fix: Adjust hinges
2. [Medium] Drawer front slightly crooked
Location: Bottom left drawer
Photo: IMG_1235.jpg
Fix: Realign and tighten screws
3. [Low] Small paint touch-up needed
Location: Inside corner of cabinet box
Photo: IMG_1236.jpg
Fix: Touch up white paint
4. [Medium] One soft-close hinge not working
Location: Upper right door
Photo: IMG_1237.jpg
Fix: Replace or adjust hinge
5. [Low] Protective film still on toe kick
Location: All base cabinets
Photo: IMG_1238.jpg
Fix: Remove protective film
Due: All items to be completed by Jan 23, 2025
Punch List Workflow
Correction process:
1. Punch List Created
- You identify issues
- Assign to contractor
- Set deadline
- Communicate expectations
2. Contractor Fixes
- Addresses each item
- Checks off when complete
- Uploads photos of fixes
- Notifies you when ready
3. Re-Inspection
- You verify each fix
- Approve or reject
- Document resolution
- Take after photos
4. Closure
- All items resolved
- Milestone approved
- Payment released
- Checklist archived
Checklist Management
Assigning Checklists
Delegate responsibility:
- Create/select checklist
- Click "Assign"
- Choose assignee:
- Specific contractor
- Trade (all plumbers)
- Team (all workers)
- Multiple people
- Set due date
- Add instructions
- Send notification
Assignee sees:
- Checklist details
- Their assigned items
- Due dates
- Instructions
- Ability to check off items
Checklist Dependencies
Sequential checklists:
Can't start Electrical Rough-in Checklist
Until Framing Checklist is 100% complete
Example:
Framing Checklist ✅ 100% complete
↓
Electrical Rough-in Checklist 🔓 Unlocked
↓
Drywall Checklist 🔒 Still blocked
Setting dependencies:
- Edit checklist
- Click "Dependencies"
- Select "Must Complete First"
- Choose prerequisite checklist(s)
- Save dependency
Recurring Checklists
Repeating inspections:
Use cases:
- Daily safety checks
- Weekly progress inspections
- Monthly quality audits
- Bi-weekly material deliveries
Setup:
- Create checklist
- Enable "Recurring"
- Set frequency:
- Daily
- Weekly (specific days)
- Bi-weekly
- Monthly
- Set end date or occurrence count
- System auto-generates instances
Example:
Daily Safety Inspection
Frequency: Every weekday
Start: January 2, 2025
End: Project completion
System creates:
☐ Safety Inspection - Monday, Jan 2
☐ Safety Inspection - Tuesday, Jan 3
☐ Safety Inspection - Wednesday, Jan 4
... (continues daily)
Collaboration Features
Checklist Sharing
With contractors:
- Select checklist
- Click "Share"
- Choose sharing method:
- Email link
- Generate PDF
- Mobile app access
- Set permissions:
- View only
- Can check items
- Can add comments
- Can edit
- Send to contractor
Contractor benefits:
- Clear expectations
- Self-check capability
- Real-time updates
- Mobile access
Comments & Photos
Item-level discussion:
Adding comments:
- Click checklist item
- Add comment
- @ mention specific person
- Upload photo
- Save comment
Use cases:
- Clarify requirements
- Document issue
- Show example
- Request guidance
- Report completion
Example:
Checklist Item: Install tile with 1/16" grout lines
Comment from Contractor:
"Tile manufacturer recommends 1/8" minimum
for this tile size. OK to adjust?"
📷 Photo of tile spec sheet
Your Reply:
"@JohnSmith That's fine. Use 1/8" grout lines.
Update checklist to reflect actual size."
Checklist Reports
Completion Report
Progress overview:
Kitchen Renovation - Checklist Summary
Period: January 1-31, 2025
Checklists Complete: 8 of 12 (67%)
Items Complete: 147 of 203 (72%)
Open Punch Lists: 2
By Category:
Safety: 4 of 4 checklists (100%) ✅
Quality: 3 of 5 checklists (60%) ⚠️
Closeout: 1 of 3 checklists (33%) 🔴
Open Checklists:
- Cabinet Installation (75% complete)
- Countertop Install (40% complete)
- Appliance Install (25% complete)
- Final Inspection (0% - not started)
Blocked Items: 5
Overdue Items: 2
Quality Metrics
Standards tracking:
Quality Control Performance
Checklists Passed First Time: 6 of 8 (75%)
Average Items per Punch List: 4.2
Punch List Resolution Time: 2.1 days avg
By Contractor:
John Smith (Carpentry)
First-time pass rate: 90%
Avg punch list items: 2.0
Resolution time: 1.5 days ✅
ABC Plumbing
First-time pass rate: 60%
Avg punch list items: 6.5
Resolution time: 3.2 days ⚠️
Insight: Plumbing work needs closer monitoring
Best Practices
Checklist Creation
- Be Specific: Clear, measurable items
- Reasonable Length: 10-20 items ideal
- Logical Order: Sequence of work
- Include Criteria: Define "complete"
- Add Photos: Visual standards
- Use Templates: Don't reinvent
- Customize: Adjust for your project
Quality Control
- Inspect Often: Catch issues early
- Document Everything: Photos, notes, dates
- Communicate Clearly: No assumptions
- Be Consistent: Same standards throughout
- Address Issues Promptly: Don't let slide
- Follow Up: Verify fixes
- Learn: Improve future checklists
Contractor Relations
- Set Expectations Early: Review checklists before work
- Be Fair: Reasonable standards
- Be Present: Available for questions
- Be Responsive: Quick answers
- Document Approvals: Written confirmation
- Pay Promptly: After checklist complete
- Give Feedback: Positive and constructive
Troubleshooting
"Checklist Not Showing for Contractor"
Check:
- Is checklist shared?
- Correct permissions?
- Contractor has account?
- Correct email/username?
Solution:
- Verify sharing settings
- Resend invitation
- Check contractor access
- Refresh app
"Can't Check Off Items"
Reasons:
- Dependency not met
- No edit permission
- Checklist locked
- Already completed
Solution:
- Check dependencies
- Verify permissions
- Unlock if needed
- Contact owner
"Dispute About Checklist Item"
Resolution:
- Review item description
- Check acceptance criteria
- Review photos/docs
- Discuss in person
- Seek compromise
- Document agreement
- Update checklist if needed
Keyboard Shortcuts
N C- New checklistN I- New checklist itemSpace- Toggle item completeC C- Add commentU P- Upload photoCtrl/Cmd + F- Find checklist
Related Guides
- Scope of Work ← - Generate checklists from SOW
- Milestones ← - Link checklists to phases
- Photo Documentation → - Document quality
- Project Overview ← - Track progress
- Reports → - Export checklist data
Last Updated: December 8, 2025
Version: 1.0
Feedback: Was this guide helpful? Rate it at the bottom of this page.